| Kilombero Bridge Daraja la Kilombero (Swahili) | |
|---|---|
|  MV Kilombero Ferry | |
| Coordinates | 8°11′22.46″S 36°41′36.68″E / 8.1895722°S 36.6935222°E | 
| Carries | 2 lanes | 
| Crosses | Ulanga River | 
| Locale | 5 km south of Ifakara, Tanzania | 
| Owner | Government of Tanzania | 
| Characteristics | |
| Total length | 384 metres (1,260 ft) | 
| Width | 11.3 metres (37 ft) | 
| History | |
| Engineering design by | NIMETA Consult (T) Ltd & Howard Humphreys (Tanzania) Ltd | 
| Constructed by | China Railway 15th Bureau Group Corporation | 
| Construction start | November 2012 | 
| Construction end | February 2017 | 
| Construction cost | TZS 53.7 billion | 
| Location | |
Kilombero Bridge is a bridge connecting in Kilombero District and Ulanga District of Morogoro Region in Tanzania. It is the longest bridge in Morogoro Region crossing the Ulanga River. [1]
It links the towns of Ifakara and Mahenge. Construction work began in November 2012 and was completed in February 2017.[2]
References
- ↑ "TENDER NO. AE/001/2010-11/HQ/C/28" (PDF). TANROADS. April 2012. Archived from the original (PDF) on 4 March 2016. Retrieved 7 March 2013.
- ↑ "Govt to spend 54bn/- to build Kilombero Bridge". IPP Media. 25 October 2012. Retrieved 7 March 2013.
External links
    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.